Design Review Checklist for
Section VIII, Division 1
This checklist has been prepared by CIS GmbH. It refers to vessels made of carbon, low alloy, high alloy steels and nonferrous metals. For other types of construction see the
ASME Code. However, this checklist is intended to be used
for help and guidance only, it cannot replace profound knowledge of the Code.
download your copy of the checklist here
|
|
|
|
Reference Paragraph |
1 |
Drawing + bill of materials (BOM) |
|
1.1 |
drawing no./rev. (revision used in the calculation?/in compliance with Quality Manual?) |
|
1.2 |
reference on the drawing to other required documents, e.g. welding doc., BOM, etc. |
|
1.3 |
ASME Code Edition, Code Cases |
|
1.4 |
units: SI/U.S. Customary/local customary units |
U-4 |
1.5 |
design data: internal/external pressure/MAWP/design temperature/MDMT/test pressure etc. |
UG-20, 21 |
1.6 |
corrosion/erosion allowance |
UG-25 |
1.7 |
materials (for all pressure parts: all permitted?/additional requirements, e.g. UT, PT, MT?) |
UG-4 thru UG-15 |
1.8 |
dimensions (ID, t, OD, etc.) |
UG-16 |
1.9 |
loads (use separate checklist as well) |
UG-22 (a) to (j) |
1.10 |
service restrictions (unfired steam boiler, cyclic, lethal, compressed air, steam/water service) |
UW-2, UG-16 |
1.11 |
joint identification on the drawing, assignment of WPS to joint, ref. to the external welding doc. |
|
1.12 |
nameplate |
UG-115, 116, 118, 119 |
|
2 |
Tolerances/Dimensions |
U-5, UG-16 (c) |
2.1 |
minimum thickness, plate and pipe tolerances |
UG-16 |
2.2 |
misalignment |
UW-33 |
2.3 |
tapered transitions |
UW-9 |
2.4 |
staggered longitudinal joints |
UW-9 |
2.5 |
out-of-roundness for internal pressure |
UG-80 (a) |
2.6 |
out-of-roundness for
external pressure |
UG-80 (b) |
2.7 |
head skirt length |
UG-32-33,
UW-13 |
2.8 |
tolerance for formed heads |
UG-81 |
2.9 |
exposed inside edges chamfered or rounded |
UG-76 (c) |
|
3 |
Calculation |
|
3.1 |
computer programm verification incl. evidence of alternate calculation per method applied |
Foreword |
3.2 |
allowable stress values used in the calculation |
UG-23,Sec.II |
3.3 |
external (stiffening rings if applied)/internal pressure calculation for all pressure bearing parts |
UG-27
ff |
3.4 |
joint efficiencies E |
UW-11,
12 |
3.5 |
corrosion allowance/static head considered in the calculation? |
UG-16,
21 |
3.6 |
required thickness values >= minimum wall thickness (UG-16) + corrosion allowance |
UG-16,
21 |
3.7 |
any external loadings considered: e.g. external nozzle loads, seismic, wind, ... |
UG-22 |
3.8 |
extreme fibre elongation |
UCS-79, UG-79, UHA-44, UNF-79 |
3.9 |
fittings
considered? |
UG-44, Table U-3 |
3.10 |
flanges |
ASME
B16.5: |
PT Rating @ design
temp. >= design pressure (incl. static head) |
UG-44 |
3.11 |
|
non
standard: |
|
App.2, App.Y |
3.12 |
|
|
material: bar?/hubbed flanges from rolled plate? |
UG-14, 2-2(d)(2) |
3.13 |
|
|
bolt
requirements |
UG-12, 2-2(e) |
3.14 |
nozzles |
size: → |
ligaments, if any → ligament efficiency considered? |
UG-53 |
3.15 |
|
→ |
small openings, if any → no reinforcement calculation needed |
UG-36(c)(3) |
3.16 |
|
→ |
reinforcement calculation needed → for shells/dished heads |
UG-37, App.1-9,10(shell) |
3.17 |
|
UG-39 |
3.18 |
|
App.1-7, App.1-10 |
3.19 |
limits of reinforcement, overlapping areas of reinforcement |
UG-37, 40 |
3.20 |
multiple
openings |
UG-42 |
3.21 |
openings in or adjacent to welds |
UG-37, UW-14 |
3.22 |
split/segmental reinforcement plates considered? |
UG-37 |
3.23 |
nozzle weld strength calculation |
UG-41, UW-15 |
3.24 |
minimum nozzle neck thickness |
UG-45 |
3.25 |
telltale holes in nozzle reinforcement plates |
UG-37(g) |
3.26 |
studded openings |
→ reinforcement calculation available? |
|
UG-37 |
3.27 |
|
UG-12,UG-43(e),(g), UG-46(i) |
3.28 |
|
→ remaining wall thickness underneath tapped holes |
|
UG-43(d) |
3.29 |
stayed
surfaces |
UG-47 |
3.30 |
|
UG-14, 48-50, UG-83, UW-19 |
3.31 |
vessel support calculation (lugs, legs, saddles,
skirt,
etc.) |
UG-4(b), UG-22, UG-54,55 |
|
4 |
Drains |
UG-25(f) |
5 |
Telltale holes for corrosion |
UG-25(e) |
6 |
Studs & bolts |
UG-12, UCS-10, UNF-12, UHA-12, 2-2(e) |
7 |
Inspection openings |
UG-46 |
8 |
Flued openings |
UG-38 |
9 |
Heat exchangers |
UHX, App. A, UW-20 |
10 |
Dimpled and embossed assemblies |
App.17 |
11 |
Electric immersion heater support plates |
App.41 |
12 |
Bellow joints |
App.26, App.5 |
13 |
Rectangular vessels |
App.13 |
14 |
Clamp connections |
App.24 |
15 |
Quick-actuating closures |
UG-35.2 |
16 |
Jacketed vessels |
App.9, UG-27(f), 28(i), 47 |
17 |
Miniature pressure vessel - check the constraints |
U-1(j), UG-116 |
18 |
Mass production of pressure vessels |
App.35 |
|
|
19 |
Welds |
|
19.1 |
joint categories |
UW-3 |
19.2 |
nozzle attachments to the shell or head |
UW-16 |
19.3 |
attachment of flat heads + covers |
UW-13, UG-34 |
19.4 |
corner joints |
UW-13(e), UG-93(d)(3-4) |
19.5 |
fillet welds from one side only |
UW-8,13, UG-34 |
19.6 |
flange attachment to nozzles |
Fig. 2-4 App.A |
19.7 |
tubesheet to shell welds |
UW-13.2 |
19.8 |
tube to tubesheet welds |
UW-20, App.A |
19.9 |
plug welds |
UW-17, 37 |
19.10 |
fillet welds |
UW-18 |
19.11 |
welded stays |
UW-19 |
19.12 |
B16.5 SO and socket flange welds |
UW-21 |
|
20 |
Heat treatment requirements |
UG-85 |
20.1 |
PWHT |
carbon and low alloy steels |
UCS-56 |
20.2 |
|
high alloy steels |
UHA-32 |
20.3 |
|
nonferrous materials |
UNF-56 |
20.4 |
HT after forming due to straining |
UCS-79, UHA-44, UNF-79 |
|
21 |
Impact Test Requirements |
UG-84,UW-48 |
21.1 |
|
carbon and low alloy steels |
|
UG-20(f), UCS-66-67 |
21.2 |
|
UHA-51 |
21.3 |
|
UNF-65 |
|
22 |
NDE |
UW-11, App.6, App.8 |
22.1 |
RT: |
carbon and low alloy steels |
|
UCS-57, UNF-57 |
22.2 |
|
UHA-33 |
22.3 |
|
UNF-57 |
22.4 |
radiographic technique |
UW-51, 52 |
22.5 |
ultrasonic examination |
UW-53, App.12 |
22.6 |
selection and location of "spots" |
UW-52 |
22.7 |
hubs machined from plates |
App.20 |
22.8 |
PT/MT mandatory |
UHA-34, UW-13(b)(4), UNF-58 |
22.9 |
NDE (PT/MT) on corner joints |
UG-93(d), UW-13(e) |
|
23 |
Test pressure |
Hydrostatic Test |
|
UG-99 |
23.1 |
|
UG-99(b) |
23.2 |
|
→ based on calculated pressure |
|
UG-99(c) |
23.3 |
|
UG-100 |
|
24 |
Overpressure Protection |
UG-125-140, App.11, App.M |
25 |
Referenced Standards |
Table U-3 |
26 |
Proof Test |
UG-101 |
27 |
Marking and Stamping/Nameplate location |
UG-115, 116, 118-119 |
28 |
NB registration number |
|
29 |
Canadian registration number |
|
30 |
Partial Data Report / Data Report |
UG-120 |
|
|
|
|
|
|
|
|
|